Scroll to top

31 October 2018 GTAC

On 31 October 2018, Gas Industry Co received the following documents from First Gas:

  1. Letter dated 31 October 2018 titled “Submission of the GTAC for assessment”
  2. Clean version of the GTAC
  3. Marked-up version of the GTAC with the changes from the version submitted on 8 December 2017
  4. Balancing and Line Pack Management Standard Operating Procedure under the GTAC
  5. Curtailment and Operational Flow Orders Standard Operating Procedure under the GTAC
  6. Metering Requirements under the GTAC
  7. Interconnection Policy under the GTAC
Page last saved: October 31, 2018


Original Link: https://gasindustry.co.nz/work-programmes/transmission-pipeline-access/developing/31-october-2018-gtac/

Page last saved: October 31, 2018