Complete Draft GTAC

On 10 August 2017, First Gas released a complete draft of the GTAC, along with a presentation that provided context for the drafting.

The following documents are available below:

  • Interconnection Agreement for Delivery Points rev.2 - clean version (16 October)
  • Interconnection Agreement for Delivery Points - changes to revision 1 (16 October)
  • Interconnection Agreement for Receipt Points rev. 1 (16 October)
  • Interconnection Agreement for Receipt Points - changes to 10 August draft (16 October)
  • Interconnection Agreement for Receipt Points - clean (10 August)
  • Interconnection Agreement for Delivery Point rev.1 clean (September 2017)
  • Interconnection Agreement for Delivery Points Changes to August Draft (September 2017)
  • Interconnection Agreement for Delivery Points (August 2017)
  • Interconnection Agreement for Receipt Points - clean (August 2017)
  • Draft GTAC release - summary presentation
  • Draft Gas Transmission Access Code (GTAC)
  • Draft template receipt point interconnection agreements (ICAs)

The process First Gas will follow for engagement on the draft GTAC is set out below. First Gas has also proposed using a web-based forum (Trello) to streamline communication and collaboration on the draft GTAC. Further information on how to access and use this web forum was provided at the 17 August workshop. 

Date

Milestone

Thursday, 10 August

Draft GTAC released

Thursday 17 August 

Workshop held in Wellington to discuss draft GTAC  and talk through purpose and content of each section. This session was facilitated by Toby Stevenson from Sapere

Thursday 24 August & Friday 25 August 

Workshop held in Wellington for parties to ask First Gas questions and provide initial comments on the draft GTAC. This session was facilitated by Toby Stevenson from Sapere (Workshop material available below)

Thursday, 31 August 

Teleconference held to discuss questions submitted since 25 August
(Draft Agenda available below)

Monday, 11 September

Revised draft GTAC released for mark-ups and submissions

Monday, 9 October

Mark-ups and submissions on revised draft GTAC due

 

The following material were made available at the 25 August 2017 Workshop, and are available below:

  • Hourly Overrun Charges (Vector presentation)
  • Nominations: Current MPOC and Proposed GTAC (First Gas presentation)
  • Schedule Two for the Draft GTAC

The following material were presented at the 24 August 2017 Workshop, and are available in the zip file below:

  • Pricing (presented by First Gas)
  • Process (presented by First Gas)
  • GTAC Priority Rights (presented by Nova)
  • DNC and 5X underrun charges (presented by Nova)
  • Priority Rights (presented by Trustpower)

 

 

Page last saved: October 16, 2017
Sign up to receive regular updates from Gas Industry Co

Get in touch

P 04 472 1800
A Gas Industry Co
Level 8, The Todd Building
95 Customhouse Quay
PO Box 10-646
Wellington 6143

Copyright © 2017 Gas Industry Company | Website by PlasticStudio | Terms & Conditions