On 18 April 2011 Gas Industry Co received a request from Maui Development Limited (MDL) to consider and make a recommendation in respect of proposed changes to the Maui Pipeline Operating Code (MPOC).
The proposed change request and consultation timetable are shown below.
Marked-up MPOC with proposed changes (word version)
Marked-up MPOC with proposed changes (PDF version)
|
Tentative
date |
Item |
|
Fri 29
April |
Publish change request and invite submissions |
|
Mon 16
May |
Submissions on proposed Change Request due |
|
Wed 8
June (originally Thurs 2
June) |
Gas Industry Co publishes Draft Recommendation and invites
submissions |
|
Tues 28
June (originally Mon 20
June) |
Submissions on Draft Recommendation due |
|
Mon 11 July
(originally Mon 4
July) |
Gas Industry Co publishes Final Recommendation |
Having considered submissions made in respect of this change request, Gas Industry Co has prepared the following draft recommendation.
Submissions are invited to be made on this Draft Recommendation. If you would like to make a submission, please do so by 5pm, Tuesday 28 June 2011.
Having considered submissions made in respect of the Draft Recommendation, Gas Industry Co has prepared the following Final Recommendation.